{"id":13495,"date":"2021-07-08T13:19:01","date_gmt":"2021-07-08T07:49:01","guid":{"rendered":"https:\/\/ferozepuronline.com\/?p=13495"},"modified":"2021-07-08T13:19:01","modified_gmt":"2021-07-08T07:49:01","slug":"fire-at-railway-drm-office","status":"publish","type":"post","link":"https:\/\/ferozepuronline.com\/?p=13495","title":{"rendered":"Fire at railway DRM office"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13496 alignright\" src=\"https:\/\/ferozepuronline.com\/wp-content\/uploads\/2021\/07\/fire-at-drm-office.jpg\" alt=\"\" width=\"550\" height=\"303\" title=\"\" srcset=\"https:\/\/ferozepuronline.com\/wp-content\/uploads\/2021\/07\/fire-at-drm-office.jpg 550w, https:\/\/ferozepuronline.com\/wp-content\/uploads\/2021\/07\/fire-at-drm-office-300x165.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><strong>Ferozepur: Fire at railway DRM office<\/strong><\/p>\n<p><strong>Ferozepur July 8, 2021: Certain records and furniture and fixtures of the accounts section were gutted in fire that broke out in the accounts section of Divisional Railway Manager (DRM) office at Ferozepur on Thursday morning.<\/strong><br \/>\nGiving this information, Rajesh Aggarwal, DRM Northern Railway Ferozepur Division, informed that at around at 10 am, the staff of accounts section noticed smoke coming out of the air conditioner, alerted the entire staff and quickly disconnected the electrical connection, besides informing the fire brigade. The fire brigade was also informed which reached within no time and the fire was controlled within five minutes.<br \/>\nHe said, the loss so far assessed is negligible. However, the investigations are on to ascertain the extent of damage and the documents that have been destroyed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ferozepur: Fire at railway DRM office Ferozepur July 8, 2021: Certain records and furniture and fixtures of the accounts section were gutted in fire that broke out in the accounts section of Divisional Railway Manager (DRM) office at Ferozepur on Thursday morning. Giving this information, Rajesh Aggarwal, DRM Northern Railway Ferozepur Division, informed that at &hellip;<\/p>\n","protected":false},"author":2,"featured_media":13496,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-13495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/posts\/13495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13495"}],"version-history":[{"count":0,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/posts\/13495\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=\/wp\/v2\/media\/13496"}],"wp:attachment":[{"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ferozepuronline.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}